New construction and renovations · Greater Houston
Plan your home’s connections before walls close.
A new home gives you the opportunity to put wiring and network connections in useful places from the start. EliteNet Solutions helps homeowners consider those decisions while the plans are still taking shape.
Bring your floor plans, project stage and priorities to a free consultation.
Request a Free Prewire ConsultationStart with how each space will be used.
Think about home-office workstations, TV locations, Wi-Fi coverage and the connected devices you plan to use. Include outdoor spaces and separate buildings where relevant.
Knowing the intended use helps identify possible cable locations before finishes limit access.
Bring the network into the home plan.
Connection locations
Discuss Ethernet outlets, access-point positions and relevant device locations.
Equipment space
Consider where routers, switches and other network equipment will live, with access and ventilation in mind.
Cable routes and future pathways
Review routes and optional pathways for later changes. The appropriate materials and approach depend on the project.
Rough-in and finish work
Define what is completed while access is open and what happens when equipment and finishes are ready.
Include your builder or designer in the same conversation.
Homeowners, builders and designers can work from the same set of network priorities. Early discussion helps align equipment locations, cable routes and finish decisions.
Share the current plan revision, construction stage and timing. The proposal identifies the low-voltage work, responsibilities and agreed coordination; other trades remain responsible for their assigned work.
Make the agreed work clear.
The project proposal defines connection locations, materials, installation stages and any checks or documentation included.
Wiring alone does not activate an internet service or complete every connected device. Equipment selection, setup and any later installation work should be identified in the scope.
Questions before you get started
When should we involve EliteNet?
Start while plans and connection locations can still be changed, ideally before low-voltage rough-in and walls close. Share your construction stage so the next step fits the project.
Can equipment be chosen later?
Some choices may be deferred, but wiring, power, equipment space and compatibility can depend on them. Discuss the likely equipment needs while planning the infrastructure.
What should I bring to the consultation?
Current floor plans, the construction stage, your intended room uses and any existing technology priorities are useful starting points.
Can my builder or designer contact you?
Yes. Use the same consultation contact and include the project stage and homeowner’s goals.
Does prewire include the final network installation?
The proposal defines the rough-in and finish stages, equipment and configuration included. Do not assume later work is included unless it appears in the agreed scope.
Start with what matters to your home.
Tell us what you want to improve or what you are planning. A free consultation is a useful place to begin.
Request a Free Prewire ConsultationCall (832) 814-5324